W+K IndustrieTechnik
Company Pipe Mill Technology Building Component Technology
The Company
Products / Service
Brochures
References
Press Releases
Events
How to find us
Imprint
Spiral Pipe
Welding Machines
Submerged-Arc Final
Welding Stands
Spiral Pipe Finishing Lines
Spiral Pipes
Advantages
Applications
HF-Longitudinal Pipe
Welding Lines
HF-Longitudinal Pipe Finishing Lines
Polyethylene Pipe
Outside Coating
Production of Tubing / Casing
Conventional process
Two-Step Production Process (System HOESCH)
Sandwich Panel Production Lines
Strip Profiling Installations
Tool Roller Sets
Wall and Roof Cladding
Cold Store Panels
Sectional-Door Panels
Home Deutsch
   
Submerged-Arc Final Welding Stands

Submerged-arc final-welding stand 
Outside welding - tandem welding 
Orthogonal conveyor, drive for pipe transport
  Submerged-Arc Final Welding Stands are used in the Two-Step Production Process for the manufacture of spiral pipes.

Inside welding beam (three-wire welding) The pipes provisionally welded in the Spiral Pipe Forming and Tack-Welding Machine are then in the second process stage finally welded on up to five separate stands, whereas the multi-wire submerged-arc welding of the inside and outside welding seam takes place simultaneously.

The welding carried out on the Spiral Pipe Forming and Tack-Welding Machine is only a provisional welding seam, which is melted completely during the submerged-arc final welding.

Technical Data:
see specification under Spiral Pipe Forming and Tack-Welding Machines

Features of the Submerged-Arc Final Welding Stands
Exact transport of the provisionally welded spiral pipes
 by orthogonal conveyors
Automatic tracking system with TV monitoring for the inside
 and outside welding heads
Welding-data recording system
The automatic production sequence from loading the
 provisionally welded pipes to the finished pipes leads to stable production conditions at a consistently good quality level.